River Rising More Rapidly Than Expected: Rt. 32 Currently Closed, Bridge Open

We have two traffic related situations in the area.

First, due to a large tree down in the vicinity of 1930 River Road, River Road is CLOSED from Narrows Hill Road to Bridgeton Hill Road.

Second, due to rising water levels, River Road from the base of the Milford-Upper Black Eddy Bridge to Lodi Hill Road will be closing soon – perhaps as early as Noon. Expect it to be closed this afternoon.

Here is a map of the closed sections of River Road. The Milford Bridge is OPEN. Link to this map on Google. 

 

 

Advertisements
Both comments and trackbacks are currently closed.

Comments

  • marc elliott  On 07/09/2011 at 10:06 AM

    Has the predicted crest changed from 20 feet?

    • bridgetonema  On 07/09/2011 at 10:34 AM

      Yes, it was just raised to 25.1′ at 8PM Tomorrow, Sept 8th.

%d bloggers like this: