Effects of Predicted Flooding

The flood projection from the NOAA as of 09:03PM 30 September 2010 is calling for a flood stage of about 25′.

– Trails’s End Lane will water on much of the road.

– Rt. 32 at Berm Lane will have water in the road.

– Rt. 32 at Bridgeton Hill Road will likely have water in the road.

All items in yards along the river should be secured. The water is rising very fast, tomorrow it will come up throughout the day.

We will post updates here and links to these updates will also be posted via Twitter – follow @bridgetonema

DO NOT DRIVE IN FLOODED ROADS.

Advertisements
Both comments and trackbacks are currently closed.
%d bloggers like this: